CVE-2026-24469 – C++ HTTP Server has Critical Path Traversal Vulnerability in RequestHandler Allowing Arbitrary File Read

CVE ID : CVE-2026-24469

Published : Jan. 24, 2026, 3:16 a.m. | 3 hours, 44 minutes ago

Description : C++ HTTP Server is an HTTP/1.1 server built to handle client connections and serve HTTP requests. Versions 1.0 and below are vulnerable to Path Traversal via the RequestHandler::handleRequest method. This flaw allows an unauthenticated, remote attacker to read arbitrary files from the server’s filesystem by crafting a malicious HTTP GET request containing ../ sequences. The application fails to sanitize the filename variable derived from the user-controlled URL path, directly concatenating it to the files_directory base path and enabling traversal outside the intended root. No patch was available at the time of publication.

Severity: 7.5 | HIGH

Visit the link for more details, such as CVSS details, affected products, timeline, and more… 

آسیب‌پذیری‌های جدید و وصله‌های امنیتی به‌صورت مداوم منتشر می‌شوند و عدم بروزرسانی به‌موقع می‌تواند امنیت سرویس‌های حیاتی را به خطر بیندازد. خدمات مدیریت و پشتیبانی سرور آفاق هاستینگ شامل پایش امنیتی، بروزرسانی نرم‌افزارها، نصب Patchهای امنیتی و سخت‌سازی سرورها است.

خدمات مدیریت و امنیت سرور

نوشته های مشابه